Realigning a watercourse around a pit, a landform or a piece of infrastructure without moving the flood risk somewhere worse — the diversion has to behave like the creek it replaces, not just carry its flow.

Capabilities

  • Hydraulic and geomorphic channel design — bed, batters and lining sized to the diverted catchment’s actual flow regime, not a generic trapezoidal template
  • Design carried from concept alignment through construction drawings on the same model, so a change late in approvals doesn’t mean starting the hydraulics again
  • Erosion and scour protection at tie-in points, sized against extreme events rather than the average year
  • Coordination with mine planning and land-access constraints so the diversion’s footprint matches what’s actually buildable

Most diversion failures show up at the tie-in points, not in the middle of the new channel — where the realigned watercourse rejoins natural ground under conditions the original design never tested. That's where the detail work goes.