Fiord Group provides hydrologist and flood engineering services in Mount Barker and across the Shire of Plantagenet, Western Australia. The practice is based in Denmark, about 80 kilometres south, and works throughout the shire on flood studies, catchment and floodplain modelling, stormwater and drainage design, farm dam and water licensing assessment, and the hydrology supporting development and environmental approvals. Principal Blake Marxsen is an environmental engineer and hydrologist, MIEAust, with a delivery record spanning mining, energy, infrastructure and government projects in Australia and overseas.
Services in Mount Barker
- Flood studies and flood impact assessment for development applications — Flood Impact Assessment
- Catchment and floodplain modelling to Australian Rainfall & Runoff (ARR) 2019 — Flood Hydrology & Modelling
- Stormwater and surface water management plans for subdivision and rural land — Surface Water Management
- Culvert, levee and detention basin design through to construction drawings — Hydraulic Structure Design
- Watercourse realignment and creek diversion design — River & Creek Diversions
- Flood immunity assessment for access roads and critical infrastructure — Flood Resilience of Infrastructure
- Hydrological input to DWER and EPA Western Australia approvals — Hydrology for Approvals
A shire that sits on a drainage divide
The Shire of Plantagenet covers about 4,790 square kilometres and does not belong to one catchment. The Kalgan River rises north-west of Kendenup and runs south to Oyster Harbour at Albany. The Hay River rises just west of Mount Barker and runs the other way, south-west to Wilson Inlet at Denmark. The Kent River headwaters sit near Tenterden at the shire’s northern edge and drain to Irwin Inlet. Which of those three a site sits above changes the receiving water, the downstream boundary condition and, in practice, which agency has an interest in the assessment.
The Kalgan is the dominant system. DWER puts its catchment at about 2,490 square kilometres, 77 per cent cleared as at 2018, with 12 gigalitres of flow and a median salinity of 6,300 mg/L in 2019. The longer salinity record, measured above the Stevens Farm gauge on 2,384 square kilometres, gives a mean of 4,700 mg/L across 1993 to 2002 against 62 per cent clearing in 1996 — moderately saline, on a long-term downward trend that reversed upward after 1990. Downstream the Kalgan discharges to Oyster Harbour, a 3,000 square kilometre catchment roughly two-thirds cleared, where the estuary’s seagrass ecosystem collapsed in the 1990s and has been in recovery since.
The Stirling and Porongurup ranges make the rainfall input harder than it looks. Bluff Knoll stands at 1,099 metres and the range runs more than 60 kilometres west to east — the only vertical obstacle to weather in any direction. The plains south of the range average about 575 millimetres a year and the plains north near Borden about 400 millimetres, while the peaks are estimated near 1,000 millimetres. That is a rainfall gradient approaching two and a half times across roughly twenty kilometres. Mount Barker itself averages 721 millimetres over a Bureau record beginning in 1886, sharply winter-dominant with a July mean of 102 millimetres. A design rainfall lifted from the townsite gauge and applied to a catchment reaching into the range will understate the input.
There is no DWER floodplain mapping anywhere in the Shire of Plantagenet — Mount Barker, Kendenup, Narrikup, Porongurup and Rocky Gully all sit outside the state’s twenty-six mapped study areas. Local Planning Scheme No. 5 nonetheless provides that a building shall not be constructed upon any land defined by the local government as being liable to flooding or inundation. In the absence of published mapping, establishing whether a particular site is liable to inundation is a site-specific hydrological question, and the shire’s Local Planning Strategy review beginning in 2026 will not change that for individual applications.
Two constraints frequently catch rural proposals here. Bolganup Creek, in the Porongurup Range, is a proclaimed surface water area under the Rights in Water and Irrigation Act 1914 — taking surface water there requires a licence. Outside it, most of the shire is unproclaimed for both surface water and groundwater, which means a farm dam may be built without a licence provided it does not store water on a watercourse or wetland and causes no sensible reduction in downstream flow. Establishing that second point is a yield and catchment calculation, not an opinion. Separately, only Mount Barker has reticulated sewerage; Kendenup, Narrikup and Porongurup do not, and Rocky Gully has neither potable water nor sewerage — so on-site effluent disposal, drainage and shallow water tables have to be resolved together rather than in sequence.
The Shire of Plantagenet grew about twelve per cent between 2016 and 2024 and its own housing strategy identifies demand for four to five hundred additional dwellings by 2036 against six completed in 2024–25. Most of that supply will land on unsewered lots in catchments with no published flood mapping. Getting the water question answered early is considerably cheaper than answering it in the middle of an assessment.
Common questions
- Is there a hydrologist in Mount Barker?
- Fiord Group services Mount Barker and the Shire of Plantagenet from its base in Denmark, about 80 kilometres south. Principal Blake Marxsen (MIEAust, BEng Environmental Honours) is a hydrologist and environmental engineer specialising in surface water — flood hydrology, catchment modelling, drainage and surface water management.
- Is there flood mapping for Mount Barker?
- No. No location in the Shire of Plantagenet appears in DWER’s floodplain mapping index, and DWER states that flood level information outside its mapped areas is not currently available. Local Planning Scheme No. 5 still prohibits building on land the local government defines as liable to flooding or inundation, so where flooding is a question on a site, the flood level has to be derived rather than looked up.
- Do I need a licence to build a farm dam near Mount Barker?
- Usually not, but the exemption has conditions. Outside proclaimed areas a landholder may build a dam capturing runoff without a licence provided the water is not stored on a watercourse or wetland, there is no sensible reduction in the volume of any watercourse or wetland, there are no significant environmental effects, and local by-laws are met. Bolganup Creek in the Porongurup Range is a proclaimed surface water area and does require a licence. Interfering with the bed and banks of a watercourse is a separate approval from taking the water.
- Which catchment is Mount Barker in?
- The shire straddles a divide. The Kalgan River rises north-west of Kendenup and drains south to Oyster Harbour at Albany; the Hay River rises just west of Mount Barker and drains south-west to Wilson Inlet at Denmark; the Kent River headwaters near Tenterden drain to Irwin Inlet. Which system a specific site sits above should be established from the site, not from the town.
- What is the difference between a hydrologist and a hydrogeologist?
- A hydrologist works with surface water — rainfall, runoff, catchments, rivers, flooding and drainage. A hydrogeologist works with groundwater — aquifers, bores, water table behaviour and groundwater licensing. Fiord Group is a surface water practice. If your question is about a bore, a groundwater licence or soil testing for effluent disposal, a hydrogeologist is the right call.
Sources
Every catchment figure on this page comes from a published agency record. Where two agencies publish different numbers for the same catchment, the more recent is used and the earlier is stated alongside it rather than quietly dropped.