Hydrologist — Perth, Western Australia

Swan Coastal Plain · Swan and Canning

Overview

Fiord Group is a hydrology and flood engineering practice with a Perth base, working on flood studies, catchment and floodplain modelling, urban stormwater and drainage design, and the water management reporting that State Planning Policy 2.9 attaches to rezoning, structure planning and subdivision in Western Australia. Principal Blake Marxsen — MIEAust, BEng (Environmental) with Honours — is a hydrologist and environmental engineer whose delivery record spans mining, energy, infrastructure and government projects in Australia, North America, South America and the Asia-Pacific.

Perth drainage is a groundwater problem wearing a stormwater costume

On the Swan Coastal Plain the controlling variable is usually not conveyance. The soils are sandy and highly permeable, and the superficial aquifer sits close to the surface — the Gnangara system alone extends over about 2,200 square kilometres beneath the coastal plain and supplies almost half the water Perth uses each year. What that means in practice is that a subdivision’s drainage design is set by separation to the maximum groundwater level, not by pipe capacity. The City of Swan, to take one published example, requires subsoil drains wherever the maximum groundwater level sits less than 1.2 metres below proposed lot levels, and requires that level to be established from on-site monitoring and historic records rather than assumed. Getting the monitoring started late is one of the most common and most expensive scheduling errors on a Perth land project.

The regulatory framework changed at the end of 2025 and a good deal of published guidance has not caught up. State Planning Policy 2.9 Water became operational on 18 December 2025 and superseded nine instruments, including Better Urban Water Management (2008) and the flooding provisions of SPP 3.4. The familiar document names went with it: a District Water Management Strategy is now a District Water Management Report, a Local Water Management Strategy is a Local Water Management Report, and an Urban Water Management Plan is a Subdivision and Development Water Management Report. The content and the stages they attach to are substantially unchanged — region scheme amendments and district structure plans, local and precinct structure plans, and subdivision and development applications respectively — and the policy does not apply retrospectively to approvals already granted.

The stormwater criteria themselves are more specific than most people quote. The current standard is DWER’s Decision process for stormwater management in Western Australia (2017), which requires runoff from constructed impervious surfaces generated by the first 15 millimetres of rainfall to be managed at source, and requires the 1% AEP pre-development flood regime — level, peak flow and storage volume — to be maintained. Minimum clearances above the 1% AEP flood level are 0.3 metres for road drainage systems and 0.5 metres for terminal retention and detention areas and for major drainage systems and waterways. The older "one year, one hour" formulation survives in some local government documents as a desirable target, but Chapter 4 of the Stormwater Management Manual that carried it has been superseded.

Flooding on the Swan and Canning is governed by mapped floodway and flood fringe. A floodway is the river channel and the portion of floodplain carrying significant flow or storage in a 1% AEP event, and new buildings are not acceptable within it; a flood fringe is the remainder of the 1% AEP floodplain, where development can be permitted if it is compatible with the flood hazard. DWER’s flood history for the Swan puts the events of record at 1872 at roughly a 100-year ARI and 1862 at roughly 60 years, with 1983 at about ten. Worth noting that the mapping addresses major river flooding only — stormwater drainage is expressly outside its scope, which is exactly why a site inside a mapped floodplain still needs its own stormwater analysis.

The long-run water balance has shifted more than the rainfall record alone would suggest, and it is the clearest illustration anywhere in Australia of why a rainfall-runoff relationship calibrated on an old record cannot be trusted forward. Before 1975 Perth’s dams received an average of about 420 gigalitres of streamflow a year. Between 2010 and 2018 the average was 72.5 gigalitres, and in 2015 it fell to 15.8. In 2025, following Perth’s wettest winter in thirty years, inflow was 35 gigalitres. Water Corporation puts the relationship plainly: before 2000 about 100 millimetres of rain generated 10 gigalitres of streamflow, and now roughly 500 millimetres is needed for the same 10. A 15 to 20 per cent rainfall reduction has produced an 80 per cent decrease in streamflow. Add acid sulfate soil risk — classified against occurrence within three metres of the natural surface, and triggered by exactly the excavation and water table lowering that shallow groundwater forces — and the Perth design problem resolves into one connected question rather than several separate ones.

Most Perth water work is lost or won at the front of a project, in the assumptions nobody wrote down: which groundwater level was adopted, which rainfall record the runoff relationship was calibrated on, and whether the flood mapping being relied on was ever meant to answer the question it is being used to answer.

Common questions

What is a Local Water Management Strategy called now?
A Local Water Management Report. State Planning Policy 2.9 Water, operational from 18 December 2025, renamed the water planning documents: District Water Management Strategy became District Water Management Report, Local Water Management Strategy became Local Water Management Report, and Urban Water Management Plan became Subdivision and Development Water Management Report. The naming changed to avoid confusion with other agencies’ water documents; the required content and the planning stages they attach to are substantially unchanged.
Which water management report does my project need?
It follows the planning stage. A District Water Management Report supports a region scheme amendment, district structure plan or local planning scheme amendment. A Local Water Management Report supports a local structure plan, precinct structure plan or master plan. A Subdivision and Development Water Management Report supports subdivision and development applications and local development plans. A Regional Water Management Report sits above all of them at framework and region scheme level.
What are the stormwater design criteria in Perth?
Under DWER’s Decision process for stormwater management in Western Australia (2017): manage at source the runoff from constructed impervious surfaces generated by the first 15 millimetres of rainfall; maintain the 1% AEP pre-development flood regime including flood level, peak flow rates and storage volumes; and design for serviceability in minor events to the standard the relevant service provider sets. Minimum clearance above the 1% AEP flood level is 0.3 metres for road drainage and 0.5 metres for terminal retention and detention areas and for major drainage systems and waterways.
Why does groundwater matter so much for Perth drainage design?
Because on the Swan Coastal Plain the soils are sandy and the superficial aquifer is shallow, so lot and road levels are usually set by separation to the maximum groundwater level rather than by pipe capacity. The City of Swan, for instance, requires subsoil drainage wherever the maximum groundwater level is less than 1.2 metres below proposed lot levels, and requires that level to come from on-site monitoring and historic records. Establishing it takes a monitoring record, which takes time — so it belongs at the start of a project, not in the middle.
Do you work in Perth as well as the Great Southern?
Yes. The practice has a Perth base alongside its Denmark base, and delivers flood and water projects across Western Australia and the Northern Territory, including the Pilbara. The Perth work is urban and infrastructure focused — flood studies, stormwater strategy, water management reporting and hydraulic design.

Sources

Every catchment figure on this page comes from a published agency record. Where two agencies publish different numbers for the same catchment, the more recent is used and the earlier is stated alongside it rather than quietly dropped.