Fiord GroupEnvironmental Engineering
Aerial view of coastal wetland and tidal waterways
Aerial view of coastal wetland and tidal waterways

Selected Project

Hydrogen Plant Detention Basins

Texas, USA · Hydraulic Structure Design

Overview

Detention basin sizing across several land reclamation scenarios for a Gulf Coast blue hydrogen and ammonia development — the drainage design that had to work whichever reclamation footprint the project ultimately adopted.

Location

Texas, USA

Sector

Renewables & Energy Transition

Scope

Hydraulic Structure Design · Flood Hydrology & Modelling

Each basin was sized so the post-development inflow hydrograph discharged at no more than the pre-development peak flow, with containment measures carried through the design where runoff could pick up contaminants from the reclaimed ground beneath it.

On reclaimed land, a detention basin is doing two jobs at once — holding the hydrograph back to pre-development rates, and making sure what it holds does not migrate. Sizing it for the first alone gets the number right and the design wrong.

More in Renewables & Energy Transition

← All Projects