
Selected Project
Sediment Control Strategy
Overview
Sediment control design for a Pilbara mine site, where the risk is not the frequent rain but the rare, intense event that moves more sediment in an hour than a normal year manages.
Location
Pilbara, WA
Sector
Mining & Resources
Scope
Surface Water Management
Sediment control at this scale isn't one structure — it's a strategy across the whole site, sized and sequenced so no single point of failure undoes the rest of it.
Arid-zone catchments concentrate a year's erosion risk into a handful of storms — the strategy was built around those events, not the long dry spells in between.
More in Mining & Resources
Next Project
Inland Water Assessment
Pilbara, WA







